Cisco CX-FEIP-1TX= Installation and con?guration Guide de l'utilisateur Page 618

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 648
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 617
Managing performance Chapter 7: Operation
7-66
phn-2513_004v000 (Oct 2012)
Maintaining the system
Once installed, a PTP 800 link should require little or no maintenance.
Yearly maintenance
Recommended yearly physical maintenance:
Check cables for corrosion, chafing etc.
Check waterproofing.
Check ground points for corrosion, tightness etc.
Monthly maintenance
Recommended monthly radio maintenance:
Read Link Loss and compare against last reading.
Read ByteER and compare against last reading.
1+1 Hot Standby link maintenance
For a 1+1 Hot Standby link, consider a controlled switchover to the inactive unit (once
every three months), to confirm that it is fully functional.
This can cause a short interruption to traffic and should be scheduled accordingly to
minimize the effects.
Vue de la page 617
1 2 ... 613 614 615 616 617 618 619 620 621 622 623 ... 647 648

Commentaires sur ces manuels

Pas de commentaire