PTP 800 Series User Guide Grounding and lightning protection
phn-2513_004v000 (Oct 2012)
2-15
Protection inside the building
Inside multi-story or high rise buildings (Figure 46), ensure that the installation meets the
following requirements:
The IF cable shield is bonded to the building grounding system at the entry point to the
building.
The IF cable shield is bonded to the building grounding system at the entry point to the
equipment area.
An LPU is installed within 600 mm (24 in) of the entry point to the equipment area.
Figure 46 Grounding and lightning protection inside high building