Installing the IF and ground cables Chapter 5: Installation
5-48
phn-2513_004v000 (Oct 2012)
8
Repeat with a further four layers of 19 mm (0.75 inch) PVC tape, always
overlapping at half width. Wrap the layers in alternate directions:
Second layer: top to bottom.
Third layer: bottom to top.
Fourth layer: top to bottom.
Fifth layer: bottom to top.
The bottom edge of each layer should be 25 mm (1 inch) below the previous
layer.
9
Completed weatherproof connection: