Cisco CX-FEIP-1TX= Installation and con?guration Guide de l'utilisateur Page 412

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 648
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 411
Preparing network connections (1+1 Hot Standby) Chapter 5: Installation
5-90
phn-2513_004v000 (Oct 2012)
Installing an out-of-band protection splitter
If a 1+1 protected configuration requires an out-of-band protection splitter, connect the
CMU Management ports to the management network as shown in Figure 105.
Use straight-through Cat5e cables with a maximum length of 2 m to connect the CMUs to
the splitter.
At the edge of the network (the ‘last hop’), if no management network equipment is
available, the two LAN ports can be connected using a protection cable. The cable pin
outs are specified in Protection cable on page 4-17.
Figure 105 Out-of-band protection splitter connections
Vue de la page 411
1 2 ... 407 408 409 410 411 412 413 414 415 416 417 ... 647 648

Commentaires sur ces manuels

Pas de commentaire