Cisco DDR2200 Series Manuel d'utilisateur Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 41
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
Method and Procedure
Field Operations Support MP-2009-08-002/ Issue 10 / Date: 11-01-10
Process Owner: Centralized Operations - Field Operations Support
Information contained in this document is proprietary
Unauthorized disclosure outside CenturyLink Corporation is prohibited
16
11.0 Qualify and Install Wiring for Gateway Installation
11.1 Install Wiring for Gateway:
Step Action
1
At NID locate and install DSL lines (two lines per customer)
2
Wire dial tone pair to home phone wiring POTS Splitter.
3
Run CAT5 cable from phone NID to data jack for the gateway.
Wire pins 3&4 (line 1 inner pair) and 2&5 (line 2 outer pair) to the data port with RJ11
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 40 41

Commentaires sur ces manuels

Pas de commentaire