Cisco Blower Module 10000 ESR Guide d'installation Page 188

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 254
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 187
17-26
Cisco 10000 Series Routers Line Card Hardware Installation Guide
OL-6773-04
Chapter 17 Installing and Removing Line Cards
Installing SFP Modules or GBIC Modules
Depending on which half-height line card you have installed, go to one of the following sections:
Installing an SFP Module or GBIC Module, page 17-27.
Attaching Cables, page 17-32.
Installing SFP Modules or GBIC Modules
We recommend inspecting and cleaning optics before installation. See the Inspection and Cleaning
Procedures for Fiber-Optic Connections document and the Compressed Air Cleaning Issues for
Fiber-Optic Connections
for more information on cleaning optical devices.
The following information is in this section:
Guidelines for Using SFP Modules or GBIC Modules, page 17-26
Installing an SFP Module or GBIC Module, page 17-27
Installing an SFP Module, page 17-28
Installing a GBIC Module, page 17-30
Guidelines for Using SFP Modules or GBIC Modules
SFP modules from different manufacturers provide different methods for freeing the locking pin and
removing the SFP module. Figure 17-23 shows three module types.
Figure 17-23 Types of SFP Module Latches
The SPF module has three types of latches, which are also the removal mechanism. See
Figure 17-23.
Tab SFP module—Pulling the tab simultaneously releases the locking pin and pulls the
SFP module out of its receptacle.
1 Tab latch 3 Bale latch
2 Swing and slide latch
8
0755
1 2 3
Vue de la page 187
1 2 ... 183 184 185 186 187 188 189 190 191 192 193 ... 253 254

Commentaires sur ces manuels

Pas de commentaire