Cisco 2500 SERIES Spécifications Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 58
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
21
Figure 10 Mounting the Controller in a 19-Inch Rack
Step 3 After the controller is mounted in the rack, perform the following tasks to complete the
installation:
Connecting the Controller Console Port
Securing the Power Adapter Cable
Connecting to the Network
Step 4 For configuration instructions about using the CLI setup program, see the “Running the
Bootup Script and Power-On Self Test” section on page 24.
1
#10-32 pan-head screws or #12-24 slotted head screws
1
282086
Vue de la page 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 57 58

Commentaires sur ces manuels

Pas de commentaire