Cisco IAD2431-1T1E1 Guide d'installation Page 18

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 17
18
Figure 13 WAN and Voice Connections
8 Powering On the Cisco IAD
Caution Do not use AC and DC power at the same time. If you do, the unit stops operating, and you must reboot it with
only a single power source.
Checklist for Power-On
You are ready to power on the Cisco IAD if it meets these requirements:
The chassis is securely mounted.
Power and interface cables are connected.
Power-On Procedure
Perform this procedure to power on your Cisco IAD and verify that it goes through its initialization and self-test. When this is
finished, the Cisco IAD is ready to configure.
VIC2-4FXO FXO RJ-11 Station side of analog PBX RJ-11 cable
Analog voice FXS RJ-21 Distribution panel RJ-21-to-RJ-21 straight-through cable
1
RJ-21 cable
3
RJ-48 straight-through cable
2
RJ-45 cable (through a patch panel) to central office
4
RJ-48 rollover cable
Table 3 WAN and Voice Cable Selection (continued)
Port or Interface Color or Type Connected To Cable (not included)
PBX
Cisco IAD2430 series
Network
demarcation
88872
Digital voice
To CO
Distribution panel
3
1
2
4
Vue de la page 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 27 28

Commentaires sur ces manuels

Pas de commentaire