Cisco 6509-NEB - Catalyst Switch Guide d'installation Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
6
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
78-16162-02
Replacing the Panel Safety Cover
Figure 1 Removing the Panel Safety Cover
Step 3 On the new panel safety cover, grasp the panel handle and press the panel into place, starting at the
bottom of the chassis and working up. Be careful not to damage the EMI gasket.
Step 4 Use a number 1 Phillips-head screwdriver to install the 8 panel screws, 4 each located along the top and
bottom of the chassis. (See Figure 2.)
Step 5 Proceed to the “Replacing the Fan Tray” section on page 7 to replace the fan tray.
105072
Pane
l
hand
le
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 27 28

Commentaires sur ces manuels

Pas de commentaire