Grounding the Chassis
You must connect the chassis to a reliable earth ground; the ground wire must be installed in accordance with local electrical
safety standards.
• For NEBS-compliant grounding, use AWG 6 (13 mm
2
) wire and the ground lug provided in the accessory kit.
• For NEC-compliant grounding, use AWG 14 (2 mm
2
) or larger wire and a user-supplied ring terminal.
• For EN/IEC 60950-compliant grounding, use AWG 18 (1 mm
2
) or larger wire and a user-supplied ring terminal.
To connect the chassis to a reliable earth ground, perform the following steps:
Step 1 Strip one end of the ground wire to the length required for the ground lug or terminal.
• For the NEBS ground lug—approximately 0.75 in. (20 mm)
• For user-provided ring terminal—as required
Step 2 Crimp the ground wire to the ground lug or ring terminal, using a crimp tool of the appropriate size.
Step 3 Attach the ground lug or ring terminal to the chassis as shown in Figure 4 or Figure 5. For the ground lug, use the two
screws with captive locking washers provided. For a ring terminal, use one of the screws provided. Use a number 2
Phillips screwdriver, and tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m).
Step 4 Connect the other end of the ground wire to a grounding point at your site.
Figure 4 NEBS-Compliant Chassis Ground Connection Using Ground Lug
Figure 5 Chassis Ground Connection Using Ring Terminal
72123
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
SEE MANUAL BEFORE INSTALLATION
SERIAL 1
SERIAL 0
CONN
CONN
WIC
2T
SEE MANUAL BEFORE INSTALLATION
SERIAL 1
SERIAL 0
CONN
CONN
WIC
2T
SEE MANUAL BEFORE INSTALLATION
DSU
56K
CD
AL
LP
RD
TD
Ground lug
attachment
103015
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
EN
V0
BANK 4
BANK 3
BANK 2
BANK 1
BANK 0
NM-HDV
VWIC
2MFT-E1
SEE
MANUAL
BEFORE
INSTALLATION
CTRLR E2
CTRLR E1
AL
LP
CD
SEE MANUAL BEFORE INSTALLATION
SERIAL 1
SERIAL 0
CONN
CONN
WIC
2T
SEE MANUAL BEFORE INSTALLATION
SERIAL 1
SERIAL 0
CONN
CONN
WIC
2T
SEE MANUAL BEFORE INSTALLATION
DSU
56K
CD
AL
LP
RD
TD
Ring terminal
attachment
Commentaires sur ces manuels